Interstate 75
(Michigan) |
Pictures are arranged in order from
south to north.
I-75 North photos are
left-aligned in the last column, while I-75 South photos are right-aligned.
Center-line pictures are centered within the last column.
Location |
Description |
Photo |
||
North- |
South- Bound |
|||
Continue south along I-75. Click here for Flint to Bay City images. |
||||
Genesee County Mundy Township |
Sign truss with lane distribution signs for I-75 and US 23 at the southern I-75/US 23 split. I-75 narrows down to a four-lane cross-section between here and the southern I-475 interchange three miles to the southeast of here, where it widens back out to six lanes. |
|||
Date: 4/09/2006 |
||||
Genesee County |
Bridge-mounted 1 mile advance exit sign for I-475 on I-75/US 23 South, affixed to the Mount Morris Rd. overpass. Note the lack of an exit tab above the sign. Of course, as the previous photos have shown, I-475 is Exit 125 off of I-75/US 23. |
|||
Date: 4/09/2006 |
High Res (95 kb) |
|||
Genesee County Vienna Township |
Sign truss with 2 mile advance exit sign for I-475 and 1 mile advance exit sign for Mt. Morris (Exit 126) on I-75/US 23 South. Again, note that the I-475 sign does not have an exit tab. |
|||
Date: 4/09/2006 |
||||
Continue north along I-75. Click here for Grayling to Mackinac Bridge images. |
<- Page 4 Back to I-75 Index Page 6 ->
Michigan Highways Index
CanHighways.com - Home
© 2007-09,
Scott Steeves/Dan Garnell/CanHighways.com. All rights reserved. All pictures
used on this site are the property of the respective photographers, and are
used by permission. No picture may be used without the consent of the
respective photographer.
Page Created: June 7, 2007.
Last Updated: June N, 2009.