King's Highway 401 - Images


Hurontario Street Construction Images

Highway 401 - Page 8 - Images


Starting in 2011, Highway 401 will undergo reconstruction and widening from the McLaughlin Road overpass to the Highway 410/403 interchange in Mississauga.  This construction project will see Highway 401 widened from six to twelve lane lanes, as collector lanes are extended westerly through the project area.  This project is scheduled to be completed by the end of 2013.

Photos taken during construction:

Photos Taken September 19th, 2012


(720x480)     (1440x960)     (2400x1600)


(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)


(720x480)     (1440x960)     (2400x1600)

Easterly view from the McLaughlin Road overpass.  Much of the concrete surface for the future collector lanes had been laid by the time this photo was taken. The westbound collector lanes currently end at a dramatic stub. View looking westerly from the Hurontario Street overpass. The concrete surface of the eastbound collector lane ends before the temporary on-ramp from Hurontario Street South.


(720x480)     (1440x960)     (2400x1600)


(720x480)     (1440x960)     (2400x1600)


(720x480)     (1440x960)     (2400x1600)


(720x480)     (1440x960)     (2400x1600)

Easterly view from the Hurontario Street overpass.  The Hurontario Street overpass lacked a eastern sidewalk when this photo was taken. View looking westerly towards the half finished Hurontario Road overpass. Standing on the future eastbound collector lanes between Hurontario Street and Kennedy Road. Easterly view towards the Kennedy Road overpass.  This overpass was constructed several decades in advance of the 401 being widened.

(720x480)     (1440x960)     (2400x1600)


(720x480)     (1440x960)     (2400x1600)


(720x480)     (1440x960)     (2400x1600)


(720x480)     (1440x960)     (2400x1600)
Centralized view from the Kennedy Road overpass.  The express lane ramp to Hurontario Street passes underneath of the collector lanes. When this photo was taken, the ramp from Highway 410 South deposited traffic onto the future westbound collector lanes.  Westerly view from the Kennedy Road overpass towards the Highway 410/403 interchange. Another view easterly from the Kennedy Road overpass.  The eastbound approach to the 410 ramp was reconstructed as part of this highway contract.


Photos Taken December 23rd, 2011


(720x480)     (1440x960)     (2400x1600)


(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)


(720x480)     (1440x960)     (2400x1600)

View looking southerly along the eastern facade of the new Hurontario Street structure.  Remnants of the wingwalls of the former structure are visible adjacent to the future express lanes. Easterly view from the Hurontario Street overpass. Westerly view from the Kennedy Road overpass.  The westbound collector lanes opened to through traffic in the middle of December, 2013. Advanced signage for the westbound exit to Hurontario Street from the newly opened collector lanes.  Note Mississauga is spelled incorrectly on the left signage.
 

(720x480)     (1440x960)     (2400x1600)


(720x480)     (1440x960)     (2400x1600)

 
Centralized view from the Kennedy Road overpass.  When the westbound collectors were first opened to traffic, the collectors narrowed to a single lane before merging with the express.  This configuration caused substantial congestion. Evening view focused on the new westbound collector lanes.  Note the airplane on descent to nearby Pearson Airport.   


Photos Taken July 30th, 2012

(720x480)     (1440x960)     (2400x1600)


(720x480)     (1440x960)     (2400x1600)


(720x480)     (1440x960)     (2400x1600)


(720x480)     (1440x960)     (2400x1600)
Easterly view from the McLaughlin Road overpass. Zoomed in perspective from McLaughlin Road.  Traffic had been diverted into the collector lanes only days before this photo was taken. A zoomed in perspective from McLaughlin Road.  East from McLaughlin Road, both the eastbound and westbound express lanes have been surfaced. Westerly view from the Hurontario Street overpass.  Work advanced quickly during the spring of 2013.


(720x480)     (1440x960)     (2400x1600)


(720x480)     (1440x960)     (2400x1600)


(720x480)     (1440x960)     (2400x1600)


(720x480)     (1440x960)     (2400x1600)

Easterly view from the Hurontario Street overpass. Easterly view from the Hurontario Street overpass. When these photos were taken, concrete paving had advanced to approximately 100m east of the Hurontario Street overpass.  The westbound collector lanes were temporarily increased to four lanes beyond the Hurontario Street interchange when the express lanes were closed for reconstruction.


(720x480)     (1440x960)     (2400x1600)


(720x480)     (1440x960)     (2400x1600)

 
Easterly view from the Kennedy Road overpass showing the nearly completed collector lanes at the Highway 410 interchange. Eastbound view from Kennedy Road showing the temporary collapse of the complex freeway into the collector lanes at Highway 410.  


Photos Taken September 19th, 2012

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)

Easterly view from the McLaughlin Road overpass.  The former eastbound and westbound carriageways have largely been demolished so that the new express lanes can be constructed A zoomed in view from the previous perspective. View looking westerly overtop of the eastbound collector lanes from the Hurontario Street overpass. A zoomed in view looking west from the Hurontario Street overpass.  The collector and express setup will collapse between Hurontario Street and McLaughlin Road for several years.

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)

Easterly view from the Hurontario Street overpass.  All that remains of the former eastbound carriageway is pictured here. Westerly view from the Kennedy Road overpass.   A centralized view looking easterly from the Kennedy Road overpass. Off-set view standing over the eastbound collector lanes of the 401.
 

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)

 
A similar perspective from the previous photo.  The tire tracks on the highway immediately before the collector to express split seems to indicate some drivers unpreparedness for the lane configuration.  Another easterly view.  The eastbound collector lanes curve around the incoming on-ramp from Highway 410 which joins the collectors on the left.  


Photos Taken December 6th, 2012

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)

Easterly view from the McLaughlin Road overpass.  Most of the concrete pavement for the future westbound express lanes was laid in the fall of 2012. A zoomed in view from the previous perspective. View looking westerly from the Hurontario Street overpass. A zoomed in view looking west from the Hurontario Street overpass.  The concrete paver sits idle at the end of the future westbound express lanes.

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)

Easterly view from the Hurontario Street overpass. A zoomed in view looking east from Hurontario Street.  Much of the work at the collector to core transfer has been completed.  Looking west from the Kennedy Road overpass.  A gap in paving exists in the westbound express lanes. Easterly view from the Kennedy Road interchange.
 

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)

 
A more focused perspective of the previous photo.  Many of the overhead sign and high mast light supports in the median have already been poured. The westbound lanes.  The flare in the concrete paving that delineates the start of the future westbound HOV lane is visible in this photo.   


Photos Taken May 6th, 2013

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)

Easterly view from the McLaughlin Road overpass. Central view from the McLaughlin Road overpass.  The centreline of the highway appears to have been shifted slightly southerly during the widening project. A zoomed in perspective from McLaughlin Road.  East from McLaughlin Road, both the eastbound and westbound express lanes have been surfaced. Westerly view from the Hurontario Street overpass.  Work advanced quickly during the spring of 2013.


(720x480)     (1440x960)     (2400x1600)


(720x480)     (1440x960)     (2400x1600)


(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)

Zoomed in perspective looking west from Hurontario Street.  Easterly view from the Hurontario Street overpass. When these photos were taken, concrete paving had advanced to approximately 100m east of the Hurontario Street overpass.  Westerly view overtop of the westbound express lanes from the Kennedy Road overpass.  Construction access to the project was provided by the pictured tunnel. 

(720x480)     (1440x960)     (2400x1600)


(720x480)     (1440x960)     (2400x1600)


(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)

Westerly view overtop of the eastbound lanes.  An asphalt base coarse is placed beneath the concrete driving surface. A zoomed in perspective from the Kennedy Road overpass showing the asphalt base coarse being laid. Eastbound view from Kennedy Road towards the 410 interchange. Second easterly view.  During the winter of 2013, most of centre median high mast lighting was erected through the contract limits. 


Photos Taken July 11th, 2013


(720x480)     (1440x960)     (2400x1600)


(720x480)     (1440x960)     (2400x1600)


(720x480)     (1440x960)     (2400x1600)


(720x480)     (1440x960)     (2400x1600)

Easterly view from the McLaughlin Road overpass. Another easterly view from McLaughlin Road overpass.  The westbound express lanes have opened to traffic while the eastbound express lanes are nearing completion. Westerly view along the centre-line of Highway 401.  The express lanes will one day feature an HOV lane, however the HOV will remain closed to traffic until the next contract to extend the complex freeway is completed. Westerly view of the new collapse of the complex freeway from the Hurontario Street overpass.


(720x480)     (1440x960)     (2400x1600)


(720x480)     (1440x960)     (2400x1600)


(720x480)     (1440x960)     (2400x1600)


(720x480)     (1440x960)     (2400x1600)

View overtop of the centreline of the freeway looking east from the Hurontario Street overpass.  Zoomed in view looking east from the Hurontario Street overpass.  Another easterly view from Hurontario Street.  The end of the third westbound collector lane is visible in this photo.  Westerly view over the eastbound lanes of Highway 401 from the Kennedy Road overpass.


(720x480)     (1440x960)     (2400x1600)


(720x480)     (1440x960)     (2400x1600)

This westerly view from Kennedy Road looks west overtop of the westbound lanes.  Eastbound view from Kennedy Road towards the 410 interchange.  


Photos Taken August 24th, 2013


(720x480)     (1440x960)     (2400x1600)


(720x480)     (1440x960)     (2400x1600)


(720x480)     (1440x960)     (2400x1600)


(720x480)     (1440x960)     (2400x1600)

Easterly view from the McLaughlin Road overpass. Westerly view of the new collapse of the complex freeway from the Hurontario Street overpass. View overtop of the centreline of the freeway looking east from the Hurontario Street overpass. View looking westerly overtop the eastbound collector lanes from the Kennedy Road overpass. 


(720x480)     (1440x960)     (2400x1600)


(720x480)     (1440x960)     (2400x1600)


(720x480)     (1440x960)     (2400x1600)


(720x480)     (1440x960)     (2400x1600)

View looking westerly overtop of the westbound express lanes from Kennedy Road. Centred view from the Kennedy Road overpass. View of the westbound lanes.  The median between the express and collector lanes was almost completed when this photo was taken. The eastbound advanced sign for the ramp to Highway 410 has been overlaid.


(720x480)     (1440x960)     (2400x1600)


(720x480)     (1440x960)     (2400x1600)

The sign at the ramp is also an overlay. Sign for Highway 410 along the ramp.  In the future, the ramp to Highway 403 will diverge from the Highway 410 ramp at this location.  

 

Photos Taken: October 14th, 2013


(720x480)     (1440x960)     (2400x1600)


(720x480)     (1440x960)     (2400x1600)


(720x480)     (1440x960)     (2400x1600)


(720x480)     (1440x960)     (2400x1600)

Easterly view from the McLaughlin Road overpass. Overhead signage for the ramp to Hurontario Street (Highway 10) from the eastbound collector lanes. View overtop of the centreline of the freeway looking east from the Hurontario Street overpass. View of the western collapse of the collector/express configuration from the Hurontario Street overpass


(720x480)     (1440x960)     (2400x1600)


(720x480)     (1440x960)     (2400x1600)


(720x480)     (1440x960)     (2400x1600)


(720x480)     (1440x960)     (2400x1600)

Central view from the Hurontario Street overpass.  Temporary concrete barriers have been placed to block traffic from utilizing sections of the highway that will not be open until the collector lanes are extended further west. Overhead advanced signage for the Airport Transfer over the eastbound express lanes. Central view from the Kennedy Road overpass.  Several overhead electrical transmission wires were digitally removed from this photo 

(720x480)     (1440x960)     (2400x1600)


(720x480)     (1440x960)     (2400x1600)


(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)

View looking westerly from Kennedy Road overtop of the eastbound collector lanes.  Easterly view from Kennedy Road.  A stub ramp was constructed for a future ramp to Highway 403 East. Central view from the Kennedy Road overpass. View again looking easterly from the Kennedy Road overpass towards the westbound lanes of the 401. 

Highway 401 Images
Highway 401 - Page 8 - Images
Back to Highway 401

www.OntHighways.com - Home


Copyright (c) 2004-2013, AsphaltPlanet.ca  AsphaltPlanet@asphaltplanet.ca