AsphaltPlanet.ca > OntHighways > Highway 401 > Images > Northumberland Construction Images  

King's Highway 401 - Images


Northumberland County Construction Images


This page includes photos from various construction projects that take place within Northumberland County.

Contract #2014-4032 Highway 401 Burnham Street to Nagle Road (Cobourg) Widening
Photos Taken June 21st, 2015

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)
On approach to the Burnham Street interchange, Highway 401 has three lanes per direction. At Burnham Street, the right-most freeway lane exits the freeway, leaving two through lanes continuing through Cobourg (and easterly to Kingston). View looking easterly through the Burnham Street overpass.  The Burnham Street overpass was replaced with the current structure in the 2000s. Easterly view towards the Highway 45 interchange from the Ontario Street overpass.

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)
Eastbound guide signage in advance of the Highway 45 interchange. View at the eastbound off-ramp to Highway 45.  Highway 45 meets the 401 at a "Parclo B" style interchange. Westerly view from the Highway 45 overpass.  Construction is underway to construct a retaining wall for a new eastbound off-ramp to Highway 45 South. Zoomed in perspective looking westerly from the Highway 45 overpass.

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)
Westerly view from Highway 45.  Note the grading fro the future directional ramp that will carry southbound traffic onto the westbound 401. Easterly view from the Highway 45 overpass looking easterly along Highway 401. View looking westerly from the Nagle Road overpass towards Cobourg. View looking easterly from the Nagle Road overpass as Highway 401 meanders through the hills of southern Northumberland County en route to Trenton and Belleville.

Photos Taken July 18th, 2015

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)
Westerly view at the off-ramp to Burnham Street. The westbound advanced signage for Burnham Street is situated adjacent to the Cobourg Creek Bridge. Close-up of the westbound advanced signage for Burnham Street. Easterly view from Ontario Street.


(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)


View looking northwesterly at the Cobourg Creek Bridge.  The bridge is being widened as part of the current construction project. Northeasterly view of the Cobourg Creek Bridge.  The date stamp on the structure reads 1993, however the structure is much older than that.  

Photos Taken August 28th, 2015

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)
View looking westerly from the Burnham Street overpass. View looking easterly from the Burnham Street overpass. Westerly view at the off-ramp to Burnham Street. It will be a tight squeeze for three lanes per direction of Highway 401 to pass through the Ontario Street overpass.

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)
Deck view looking westerly on the Cobourg Creek Structure.  View looking westerly towards the Burnham Street interchange from the Ontario Street overpass. Easterly view from the Ontario Street overpass towards the Highway 45 interchange. View looking westerly from the Highway 45 interchange.  During this phase of construction, traffic has been shifted onto the inner shoulder of the Cobourg Creek bridge.

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600) 
Zoomed in view looking westerly from the Highway 45 interchange. Southbound signage for the Eastbound on-ramp to Highway 401 from Highway 45.  Easterly view from the Highway 45 overpass along Highway 401. Highway 401 curves to the north east of the Highway 45 interchange. 

(720x480)     (1440x960)     (2400x1600)


(720x480)     (1440x960)     (2400x1600)


(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)
View looking westerly at the westbound off-ramp to Highway 45. Westbound advanced signage for the Highway 45 interchange. Westerly view from the Nagle Road overpass.  Note the sediment control measures on the northern cut embankment.  A huge emphasis is placed on sediment management on modern construction projects. Easterly view from the Nagle Road overpass.  The construction contract ends just beyond the pictured curve in the distance. 



Highway 401 Images
Highway 401 - Page 12 - Images
Highway 401 - Page 13 - Images
Back to Highway 401

www.OntHighways.com - Home


Copyright (c) 2004-2016, AsphaltPlanet.ca  AsphaltPlanet@asphaltplanet.ca