King's Highway 401 - Images
Essex area Highway 401 Construction Images
The MTO is currently reconstructing and widening Highway 401 between Windsor and Tilbury in Essex County. This page is devoted to chronicling the ongoing changes to the highway through Essex County during this major reconstruction.
Phase 4 - Highway 3 to Manning Road (2007 - 2010)
The Windsor to Manning Road widening is the fourth of five multiyear projects to widen Highway 401 to six lanes between Windsor and Tilbury. This project is arguable the most complex, as it involves replacing a very major railway flyover and the significant reconfiguration of the Tunnel Route interchange.
Highway 401 construction images arranged from West to East:
Photo Location |
December 5th, 2004
& May 5th, 2005 |
July 6th, 2008 |
Construction Complete |
Looking west from the Highway 3 overpass | no photo available | no photo available | |
Looking east from the Highway 3 overpass | no photo available | no photo available | no photo available |
Looking west from the North Talbot Road overpass | no photo available | ||
Looking east from the North Talbot Road overpass | no photo available | ||
Looking west from the Tecumseh 8th Concession Road overpass |
(720x480) (1440x960) |
no photo available | |
Looking east from the Tecumseh 8th Concession Road overpass | no photo available | ||
Looking west from the Tecumseh 9th Concession Road overpass | no photo available | ||
Looking east from the Tecumseh 9th Concession Road overpass | no photo available | ||
Looking west from the Tecumseh 10th Concession Road overpass | no photo available | ||
Looking east from the Tecumseh 10th Concession Road overpass | no photo available | ||
Looking west from the Tecumseh11th Concession Road overpass | no photo available |
Phase 2 - Manning Road to Puce Road (2005 - 2006)
The Manning to Puce Roads contract is the second set of a series of widening contracts that will see Highway 401 six laned from Windsor to Tilbury. The western portion of the contract (from west of Manning Road to east of 8th Concession Road) was completed late in 2005, while the second half of this contract (from east of 8th Concession road to east of Puce Road) is ongoing in 2006.
Photo Location | Pre - Construction |
May 5th, 2005 |
October 17th, 2005 |
March 17th, 2006 |
Construction Complete |
Looking east from the Tecumseh 11th Concession Road overpass | no photo available | ||||
Looking west from the Manning Road overpass |
(720x480) (1440x960) |
(720x480) (1440x960) |
(720x480) (1440x960) |
(720x480) (1440x960) |
|
Looking east from the Manning Road overpass | no photo available | ||||
Looking west from the 9th Concession Road overpass | no photo available | ||||
Looking east from the 9th Concession Road overpass | no photo available | ||||
Looking west from the 8th Concession Road overpass | no photo available | ||||
Looking east from the 8th Concession Road overpass | no photo available |
(720x480) (1440x960) |
|||
Looking west from the 7th Concession Road overpass | no photo available |
Phase 5 - Puce Road to French Line Road (2008 - 2009)
This section of Highway 401 was widened between 2008 and 2009, and included the complete replacement of the Belle River Road overpass.
Phase 3 - French Line Road to Highway 77 (2006 - 2007)
This section of Highway 401 was widened between 2006 and 2007, and included the complete replacement of the French Line Road overpass.
Phase 1 - Highway 77 to Highway 2 (2004 - 2005)
The first project to be completed in the reconstruction and widening of Highway 401 between Windsor and Tilbury was completed from west of Highway 77 to east of Highway 2 (Tilbury West junction) in late fall of 2005. This construction started in the spring of 2004, and progressed over two seasons. The construction saw the total reconstruction of Highway 401 through the contract limits, as well as ramp realignments at both the Highway 2 and Highway 77 interchanges, as well as the replacement of the Highway 77 structure over Highway 401.
Photo Location |
April 23rd, 2004 |
December 5th, 2004 |
September 10th, 2005 |
October 17th, 2005 |
March 17th, 2006 |
Looking west from the Highway 77 overpass | no photo available |
(720x480) (1440x960) |
(720x480) (1440x960) |
(720x480) (1440x960) |
|
Looking east from the Highway 77 overpass | no photo available | ||||
Looking west from the Gracie Sideroad overpass | no photo available | no photo available | no photo available | ||
Looking east from the Gracie Sideroad overpass | no photo available | no photo available | no photo available | ||
Looking west from the Highway 2 overpass | no photo available | no photo available | |||
Looking east from the Highway 2 overpass | no photo available |
Highway 77 Bridge Demolition Photos Arranged from oldest to newest:
As part of the Highway 401 reconstruction, the vintage Highway 77 overpass was demolished, and replaced by a new modern concrete beam bridge. The vintage structure was removed the evening of April 16th, 2005. The structure was removed before a replacement structure had been erected because the centreline of Highway 401 was shifted northerly a short distance to broaden the highway curve just east of Highway 77.
The eastern facade of the vintageHighway 77 overpass. |
The western facade of vintage overpass Picture taken: March 29th, 2005. |
Highway 401 Images Index
London Construction Images ->
Back to Highway 401
Copyright (c) 2004-2010, AsphaltPlanet.ca AsphaltPlanet@asphaltplanet.ca