King's Highway 412 - Images


Highway 412 - Construction Images

Highway 412 - Images


Highway 412 is a toll road that is being built concurrently with the extension of Highway 407 through Durham Region. Highway 412 was first known as the West Durham Link and is one of two north-south highways that is being constructed through Durham Region as part of the Highway 407 project. The highway is scheduled to open in the Spring of 2016, and will feature interchanges at Highway 401, Highway 2 (Dundas Street), Taunton Road, Highway 7, and Highway 407. An additional interchange at Rossland Road will be constructed at a later date.

Photos taken during construction:

July, 2015 Photos

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)
Centralized view looking westerly from the Lake Ridge Road overpass over the new alignment of Highway 401. Additional view looking westerly from the Lake Ridge Road overpass towards Highway 401.  Much of the pavement had been removed from the former highway alignment when this photo was taken. Easterly view from the new Lake Ridge Road overpass.  The now demolished remnants of the former Lake Ridge Road overpass are all that remain. Easterly view from the Lake Ridge Road overpass over the former alignment of Highway 401.  Much of the former pavement has now been removed.

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)
View looking easterly from the new Lake Ridge Road overpass towards the former structure.  The superstructure had yet to be demolished overtop of the busy train lines that run adjacent to Highway 401. Easterly view from Lake Ridge Road towards the future W-N ramp that will link Highway 401 to Highway 412. Drivers view looking easterly through the structure that will carry southbound 412 traffic to the eastbound lanes of the 401. Additional view looking easterly through the N-E ramp from the 412, showing the intricate internal steel webbing.

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)
Southerly view along the future alignment of Highway 412 from the Highway 2 overpass.  There was still much work to do when this photo was taken. Easterly view along Highway 2 at the future Highway 412 grade separation.  The structure that will carry the future westbound lanes was built first, and is located immediately to the north of the existing road. Northerly view along the graded alignment of Highway 412 from just north of Highway 2. Additional northbound view.  When this photo was taken, grading was only underway on a short stretch of the future highway through the Highway 2 interchange.

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)
Westerly view along Rossland Road.  The future grade separation was constructed immediately to the north of the existing roadway. Southerly view from Rossland Road.  Little in the way of grading had commenced when this photo was taken. Northerly view from the Rossland Road overpass towards the the CPR overpass. Southerly view of the Rossland Road structure.  The pavement elevation of the 412 is noticeably lower than that of existing ground elevation.

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)
View looking northerly towards the CPR structure.  The right two structures will allow the 412 to pass beneath the railway, while the left structure will allow a future transitway to pass beneath the railway. Southerly view at the Taunton Road grade separation. Easterly view on the deck of the future Taunton Road overpass.  The new structure was built immediately to the north of the former roadway centreline. Northerly view from Taunton Road.  The graded alignment of Halls Road is still visible in the centre-left of the photo.


October 10, 2015 Photos

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)
Westerly view from the Lake Ridge Road overpass.  This picture highlights the point where the future ramp from the southbound 412 will join Highway 401 traffic. Centralized view of Highway 401 from the Lake Ridge Road overpass.  Little remains of the former alignment of Highway 401 to the south. Westerly view overtop of the future sub-collector lanes that will carry traffic entering from the Lake Ridge Road interchange before it merges with Highway 401 traffic. Easterly view overtop of the westbound lanes of Highway 401 from the Lake Ridge Road overpass.

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)
View looking easterly from the Lake Ridge Road overpass overtop of the central median of Highway 401. Eastbound view overtop of the future, and now graded, ramp that will carry eastbound motorists to Highway 412 North. Drivers view looking easterly on the 401 as the highway passes beneath the ramp that will carry eastbound traffic to the northbound lanes of Highway 412. Westerly view of the future western ramps between Highways 401 and 412.  The Lake Ridge Road overpass is visible in the distance.

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)
View beneath the future ramp that will carry eastbound Highway 401 traffic to Highway 412 north. An additional westerly view beneath the E-N ramp between Highways 401 and 412. View looking easterly along Highway 401 from the Highway 412 E-N ramp. Zoomed in perspective of the previous photo.  A GO Train is visible passing by the south side of the 401.

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)
Westerly view along Highway 401 from the N-E Ramp. Deck view of the future N-E ramp.  The intricately placed rebar is still awaiting final encapsulating in concrete. View looking beneath the N-E Ramp.  The steel webbing that provides lateral reinforcement between the girders is visible in the structure. View looking westerly along Highway 401 from the N-E Ramp.

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)
View looking westerly along Highway 401 from the Henry Street overpass.  All Highway 401 was shifted onto the future westbound lanes at the Lynde Creek Bridge when this photo was taken. Zoomed in view, again looking westerly from the Henry Street overpass along Highway 401. The Henry Street overpass dates back the original construction of Highway 401, and will be replaced in an unrelated contract starting in 2016. View looking northerly towards the Highway 2 overpass along Highway 412.

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)
Southerly view along the future W-N ramp as it passes beneath the structure that will carry the S-E ramp. View looking along the W-N ramp.  The E-N ramp is also visible to the left of the photo. Northerly view along the half finished Highway 2 overpass. An additional view of the Highway 2 overpass.

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)
Southerly view along Highway 412 from just south of the Highway 7 underpass. Easterly view along Highway 7 at the Highway 412 interchange. View looking westerly along Highway 7 at the twin Highway 412 structures. View looking northerly from the median of Highway 412 at the Highway 7 grade separations.

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)
View looking northerly as the northbound lanes of Highway 412 split into the ramps to both Highway 407 West and East. View of the western side of the structure that carries the S-W ramp from Highway 412 to Highway 407. Deck view from the S-W structure.  The deck had been paved and was nearly complete when this photo was taken. Westerly view along Highway 407 from the Highway 412 S-W ramp.

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)
Easterly view from the S-W ramp along the eastbound lanes of the 407. View of the three level interchange between the 407 and the 412.  The ramp at the lowest level will carry westbound 407 traffic to southbound 412. Close-up view of the three level interchange between the 407 and the 412. View beneath the steel structure that carries the ramp from the 412 North to the 407 West.

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)
View looking easterly along the 407 towards the Coronation Road bridges. Westerly view from the Coronation Road overpass towards Highway 407. View looking westerly towards the westbound off-ramp to Lake Ridge Road.  The westbound off-ramp to Lake Ridge Road snakes between the edge of the right of way and the S-W ramp from Highway 412. Easterly view from the Coronation Road overpass along the 407.




December 26, 2015 Photos

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)
Westerly view along the western ramps to and from Highway 401 from Highway 401. Easterly view along the eastern ramps to and from Highway 401 from Highway 412. Northerly view along Highway 412 from the cross-over between the southbound off-ramp over the northbound on-ramp. Additional view from the similar perspective.

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)
View looking southerly from the Highway 2 overpass towards the Highway 401 interchange.  The toll gantry is visible crossing the northbound lanes. View looking southerly from the Highway 2 overpass Northerly view from the Highway 2 overpass along Highway 412.  The southbound toll gantry is located north of the Highway 2 overpass. Additional view looking northerly along Highway 412 from Highway 2.

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)
Southerly view as the lanes split to the Highway 401 ramps. Southerly view at the off-ramp to Highway 2. Southbound advanced signage for the Highway 2 interchange. Diagram signage in advance of the southern terminus of Highway 412 at the 401.

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)
Northbound signage approaching the Highway 7 and Highway 407 interchanges. Northbound advanced signage for the off-ramp to Highway 7 interchange. Signage at the northbound off-ramp to Highway 7. Overhead signage at the northbound ramp to Highway 407.

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)
View looking westerly from the S-W ramp towards Highway 407. Additional view looking westerly from the S-W ramp. Additional westerly view from the S-W ramp.  The Highway 412 and Lake Ridge Road ramps are closely intertwined. Southerly view along the 412 from the S-W Ramp.

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)
View looking northerly on the future southbound lanes of Highway 412 approaching the three-level Highway 407 interchange.  View of the future structure that will carry the ramp from Highway 412 North to Highway 407E West. Drivers using the ramp at the lowest level of the interchange are treated to an interesting view as they pass from the 407 to the 412. View from the lowest level of the three level Highway 407/412 interchange. trench.

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)
View of the three level interchange, looking westerly beneath the future S-W ramp. Easterly view from the S-W ramp. Additional view looking easterly along the 407 from the 412. Westerly view along the ramp that links Highway 407 West to Highway 412 South.

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)

(720x480)     (1440x960)     (2400x1600)
Westbound 407 signage for the ramp to Lake Ridge Road. Westbound advanced signage for the ramp to Lake Ridge Road. Signage at the westbound off-ramp to Highway 412 South. Westbound advanced signage for the off-ramp to Highway 412.


Highway 407 East Extension Phase 1 Construction Images

Highway 412 Images
Back to Highway 412

www.OntHighways.com - Home


Copyright (c) 2004-2016, Scott Steeves (Webmaster)  scott@asphaltplanet.ca